Click on ballot measure for more detail.
- Measure B.
Construction Boundaries
-- City of Del Rey Oaks
(Majority Approval Required)
Fail:
387 /
49.24% Yes votes ......
399 /
50.76% No votes
- Shall the City of Del Rey Oaks be prohibited from agreeing to or constructing any tunnel, including the one proposed by FORTAG under Highway 218 for access to the Frog Pond Wetland Preserve, and be limited to the use of Highway 218, General Jim Moore Blvd. and South Boundary Rd. for the construction or routing of any formal bike trails, or recreation trails within the City of Del Rey Oaks unless otherwise approved by the voters?
- Measure C.
School Bond
-- San Lucas Union Elementary School District
(2/3 Approval Required)
Fail:
22 /
59.46% Yes votes ......
15 /
40.54% No votes
- To construct a new track and shade structures, replace portable classrooms and improve other school facilities; replace outdated infrastructure; and improve the quality of education; shall San Lucas Union School District's measure be adopted to issue $3,600,000 in bonds at legal interest rates, estimated levies of approximately 6¢ per $100 assessed value, generating on average $240,000 annually while bonds are outstanding, with annual reports, no money for salaries and all money improving local schools?
|
|
This election is archived. Any links to sources outside of Smart Voter may no longer be active. No further links will be added to this page.
|
Links to sources outside of Smart Voter are provided for information only and do not imply endorsement.
|